Checklist

The installation checklist should be completed prior to visiting the site to carry out the installation. The checklist covers a number of items confirming that you have followed the procedure set out in the quality management system to ensure all materials are available on site on the day of the job. In addition the checklist includes the risk assessment for the site. A risk assessment is required for each job.

Risk Assessment

In the risk assessment section of the checklist select risk assessment type from the drop-down list. This will insert the risk assessment text to be included in the pre-installation report. Edit the text to reflect any site-specific issues and then select the check box to mark the assessment is completed. The risk assessment is included in the installation report which is handed to the team before they visit the site.